April, May and June have been busy at the house. Plumbing, electical and HVAC have been added to the inside. We are almost ready for insulation and sheet rock. The exterior siding has been painted, the roof installed and the rock is going up.
The siding was painted and then the roof installed. Putting up 60 ft sections of metal roof is tricky.
Installation required a day with no wind.
Many hands were required to lift each section to the roof.

One section of rock on the back is complete.


Now the rock is going up.

2 comments:
I can't wait to see it in person!
Me too me too! It looks great!!
Post a Comment